Nakondwa Teachers House 2 completion
In 2024, Nakondwa Primary School, located in the area of Group Village Headman Chimombo under Traditional Authority Msakambewa in Dowa, began constructing a three-bedroom teacher’s house to...
Learn More About This ProjectAbout this Project
In 2024, Nakondwa Primary School, located in the area of Group Village Headman Chimombo under Traditional Authority Msakambewa in Dowa, began constructing a three-bedroom teacher’s house to address a critical shortage of teachers’ housing. The school currently has six teachers for grades 1 through 8, but only four houses—two of acceptable standards and two substandard—are available. This shortage forces some teachers to commute long distances, resulting in inconsistent attendance and unattended classes.
The community has co-invested $1,594.52 with Mudzi Connect to support the construction. Major activities in this final phase include plastering, painting, fixing fisher boards, and flooring. The majority of the funding will be used to purchase materials, with a portion allocated for labor costs. Completion of the house is expected to improve teacher retention, reduce absenteeism, and enhance the quality of education for students at Nakondwa Primary School.
Situated in Msakambewa, Dowa district, Chimombo Village Development Committee, in collaboration with the Nakondwa School Management Committee and the local community, successfully completed the construction of a teachers’ house at Nakondwa Primary School. This project, initially started in 2024 but faced delays due to rising costs of construction materials. Major activities carried out in the final phase included plastering, painting, flooring, and fixing fisher boards. The completed house is already occupied by a teacher, providing a safe and comfortable living space. This achievement is expected to improve teacher retention, reduce absenteeism, and enhance the overall learning environment for students at Nakondwa Primary School.